Fateh Kimia Petrochemical Complex is a privately-owned petrochemical plant under implementation in Dayye aside Persian Gulf in southern Iran.
In response to the overwhelming need for petrochemical products, this facility will be constructed in three phases.
In the initial phase of operation, it reaches the production capacity of 1.65 million tons of methanol per annum (5,000 MTPD).
The next phases will be allocated to production of Propylene and Polypropylene respectively. Natural gas feed required by the plant is estimated to be 4.7 million cubic meters per day, and the related long term contracts for supply of feed have been signed with National Iranian Gas Co.
The first phase of the plant is licensed by Casale SA, and PIDEC in conjunction with Fateh Group will mutually undertake Engineering, Procurement and Construction (EPC) activities and services. In order to support process units, all utilities and offsites including Air, Water, Steam, Oxygen and Nitrogen are already foreseen in the preliminary basic design.
|
|